Nb - Table Assembly (05-25-22).mp4 Apr 2026
: Must be mounted to the underside of the shelf before the shelf is attached to the mast.
: The vertical mast is secured to the base, which often features large industrial casters for mobility. NB - Table Assembly (05-25-22).mp4
: For models with power kits (like the 750 or 1,250 inverters), the unit is mounted and the switch is set to "auto remote" mode. : Must be mounted to the underside of
The assembly typically focuses on a modular, heavy-duty frame designed to hold power kits and industrial equipment. According to the NB Series Assembly Manual , the process generally follows these steps: The assembly typically focuses on a modular, heavy-duty
: Always ensure the table is on a flat, level surface and that casters are locked before use.
: Ensure the battery voltage does not drop below 10.8V to maintain operation. Accessory Installation :