Iris Energy Expands Self-mining Capacity To 5.5... Apr 2026
: All new capacity is powered by 100% renewable energy infrastructure across sites in British Columbia and Texas. Infrastructure & Execution
The jump to 5.5 EH/s served as the foundation for IREN's rapid scaling through 2024 and beyond: Iris Energy provides 10 EH/s expansion update | IREN Iris Energy expands self-mining capacity to 5.5...
: The transaction fully resolved Iris Energy's remaining obligations under its previous 10 EH/s contract with Bitmain. : All new capacity is powered by 100%
: As of March 2023, the company had already reached 2.0 EH/s in operating hashrate, with the remaining 3.5 EH/s scheduled for rapid installation following delivery. Future Scaling Beyond 5.5 EH/s Iris Energy expands self-mining capacity to 5.5...
: The expansion utilized Bitmain Antminer S19j Pro miners, which operate at an efficiency of 29.5 J/TH .
