: Before taping, ensure the panel surface is dry and free of sawdust, dirt, or frost to ensure proper adhesion.
: Secure the panels to the framing using recommended fasteners. Ensure the "green" side (for walls) or "sienna" side (for roofs) is facing out. Leave a 1/8-inch gap at all panel edges to allow for expansion. 156694 zip
: Press the zipper tape into the designated area defined by the guide for a professional, symmetrical finish. : Before taping, ensure the panel surface is
: Use ZIP System® liquid flash or flashing tape to seal around windows, doors, and pipe penetrations. Acrylic Zipper Guide Guide (Sewing) Leave a 1/8-inch gap at all panel edges
The ZIP System® is a structural roof and wall system with a built-in water-resistive barrier that eliminates the need for house wrap.
: Center the tape over the seams. For wall applications, tape vertical seams first, followed by horizontal seams to create a "shingle" effect for water shedding.